Inside the tunnel, the thermometer reads -3°C and the 1.3 km indoor tracks are always freshly groomed. Since its inauguration in 2006, the Torsby ski tunnel has extended the skiing season for thousands of skiers. And perhaps it is here that some of the best cross-country skiers of our time have dared to aim high and dream big.
Thomas Betong proudly delivered the concrete for this project. The tunnel is designed to follow the natural landscape.