Supplying over 21,000 cubic yards of low-carbon concrete, Thomas Concrete supported one of Florence’s most demanding distribution center projects through technical innovation, precise logistics, and cross-market collaboration.

Supplying the 386,047 sq. ft. Cheney Brothers Florence Distribution Center required precision, flexibility, and collaboration across multiple markets. Thomas Concrete delivered 21,350 cubic yards of Thomagreen low-carbon concrete to support a large-scale, fast-paced project in a relatively small market. With multiple contractors on site, each requiring proprietary mix designs, logistics and batching accuracy were critical. The availability of two batch plants at our Florence location provided a unique advantage, allowing us to maintain consistency, meet tight schedules, and support simultaneous pours without disruption.

A Thomas Concrete mixer pours concrete for the warehouse floor.

To meet the project’s demanding performance and temperature specifications, Thomas Concrete partnered closely with contractors to engineer practical solutions. A dedicated silo was allocated for Type K expansive cement used in cold storage flooring, and exterior paving was value-engineered by converting portions of traditional steel reinforcement to Fiber Force® 750 macro fiber at 5 lbs per cubic yard. Extreme summer and winter conditions were managed by supplying treated water using both a boiler and chiller, ensuring strict placement requirements were met, including a maximum concrete temperature of 85°F during peak summer pours. Support from three additional Thomas Concrete markets helped ensure uninterrupted supply for a project that required extensive coordination and technical expertise.

PROJECT FACTS

Type:Warehouse and Distribution
Location:Thomas Concrete, USA
Developer:Cheney Brothers, Inc.
Contractor:Southeast Concrete Systems, The Fricks Company, Chris Squire Contractors
Architect:A M King
Period:2024-2025

Products used in this project

Similar Projects

Scroll to top