During the vessel’s extensive refit, its ballast was replaced with specially developed heavyweight concrete from Thomas Beton. Between 2018 and 2019, approximately 300 metric tons of concrete were delivered for the project.
The customized solution provides the weight and stability required in demanding marine conditions. By combining material expertise with a solution adapted to the vessel’s specific requirements, Thomas Beton contributed to the continued service and long-term stability of this historic training ship.