a { text-decoration: none; color: #464feb; } tr th, tr td { border: 1px solid #e6e6e6; } tr th { background-color: #f5f5f5; }
The work is part of the Elbląg Waterway, which improves navigation between the Vistula Lagoon and the Gulf of Gdańsk. Since several sections of the riverbank were difficult to access from land, the concrete was pumped through a pipeline floating on the river. This required customized concrete mixes, careful planning, and close coordination to ensure consistent quality and continuous delivery. Through technical expertise and reliable deliveries, Thomas Beton contributed to safer shipping and long-term flood protection.


